top of page

Sustrans Archway

Skellingthorpe Old Wood, Lincolnshire

RIBA STAGE: 7 - IN USE

Completed 2015

The aim of this proposal was to embody the story of a tree; by constructing a large oak archway upon Sustrans Cycle-way, which runs from Harby to Lincoln. The final design utilises Cor-Ten steel to mediate 21st Century technology with traditional craft. This project brought together the diverse and wide range of skills that Hill Holt Wood has at its disposal.

Environmental Aspects: Local Sourced Timber, Local Labour, Engagement with Nature

bottom of page